Select a link below or on the map to the right to view more information about these projects.
Location: Ogdensburg, NY
Configuration: Formerly 2+1 Combined-Cycle, currently being repowered to fire biomass fuel (woody feedstock)
Capacity: 25 MW
Operation: 1994 / 2009*
Fuel: Biomass
HRSG Supplier: Zurn
Unit Supplier: GE Fitchburg
EPC: NEPCO
Location: Batavia, NY
Configuration: 1+1 Combined-Cycle Cogeneration Block
Capacity: 62 MW
Operation: 1992
Fuel: Natural Gas
HRSG Supplier: Zurn
Unit Supplier: GT - GE FR6001; ST - GE Fitchburg
EPC: NEPCO
Location: Sherrill, NY
Configuration: 1+1 Combined-Cycle Cogeneration Block
Capacity: 62 MW
Operation: 1992
Fuel: Natural gas
HRSG Supplier: Zurn
Unit Supplier: GT - GE FR6001; ST - GE Fitchburg
EPC: NEPCO
Location: Middletown, NY
Configuration: Twin-Pac Simple Cycle Peaking Gas Turbine
Capacity: 55 MW
Operation: 1971
Fuel: Natural Gas, Kerosene, Bio-diesel
Unit Supplier: GT - P&W GG4A; Expander - Worthington
EPC: Consolidated Edison, Inc.
Location: Hillburn, NY
Configuration: Twin-Pac Simple Cycle Peaking Gas Turbine
Capacity: 55 MW
Operation: 1971
Fuel: Natural Gas, Kerosene, Bio-diesel
Unit Supplier: GT - P&W GG4A; Expander - Worthington
EPC: Consolidated Edison, Inc.
Swinging Bridge Reservoir provides a significant amount (17,222 ac-ft) of upstream storage capacity. There are two public recreation areas located on the Swinging Bridge Reservoir. The entire area below the Swinging Bridge embankment is a designated Bald Eagle habitat. Read more...